Sign In | Join Free | My ccnmag.com
China Sussman Machinery(Wuxi) Co.,Ltd logo
Sussman Machinery(Wuxi) Co.,Ltd
Sussman Machinery (Wuxi) Co., Ltd.
Verified Supplier

10 Years

Home > Rack Roll Forming Machine >

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Sussman Machinery(Wuxi) Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Brand Name : SUSSMAN

Model Number : SS-RS

Certification : CE.SGS.ISO

Place of Origin : China

MOQ : 1 set

Price : negotiable

Payment Terms : L/C, T/T

Supply Ability : 10 sets per month

Delivery Time : Shipped in 90 working days after payment

Packaging Details : Standard package with film, plastic and steel wire. (or customized)

Material thickness : 1.2-2mm

Forming speed : 12-15m/min

Forming stations : 18 stations

Material : galvanized steel

Control system : PLC with touch screen

Main power with reducer : 11KW

Hydraulic station power : 5.5KW

Contact Now

Racking shelf roll forming machine


Technical Parameter
1. Suitable Plate Material: thickness 1.2-2.0mm, Galvanized steel S235JR
2. Working Speed: 12-15 meters / min
3. Forming machine: 18 stations
4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome
5. Material of Shaft: 45# Advanced Steel (Diameter: 76mm), thermal refining
6. Driven system: Chain Driven 1.5 inches 20A double chain with longer shafts
7. Main Power with reducer: 11KW WH Chinese Famous
8. Cutting: Hydraulic Cutting Cr12mov
9. Material of Cutting Knife: Cr12Mov, Quench HRC58-62
10. Hydraulic Station Power: 5.5KW
11. The whole machine is controlled by industry computer-PLC.
12 PLC--Panasonic, Japan English and Chinese Language
13. Touch Screen--Panasonic Japan
14. Encoder--Omron, Japan
15. Electric parts--Schneider
16. Outline of main about 7500mm*800mmm*800mm
17. Weight : about 8 tons


Main Components

Serial No.

Commodity & Description

Quantity

1

5T manual uncoiler

1 set

2

Leveing guiding

1 set

3

Servo feeding device

1 set

4

Punching machine

1 set

5

Main roll forming machine

1 set

6

Hydraulic station

1 set

7

Cutting device

1 set

8

Finished products tabel

1 set

9

PLC control system

2 sets

10

Out tables

1 set

11

Spare parts 1 set


Working Flow of Roll Forming Machine

A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)

B.Servo Feeding Applicator............................................To feed the material accurately

C.Hydraulic/Press Punching...........................................To punch as requirements

D.Roll Forming Unit.........................................................To roll form as requirements

E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)

F.Output Table................................................................Support the finished products


Uncoiling—Feeding&Leveling-Punching--Roll forming—Cutting—Products collecting


Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Advantage of machine

1. Reasonable Price

2. High Quality

3. 12 Months Warranty

4. More Than 10 Years Experience

5. Durable

6. Reliable

Profile of product

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Photo Gallery


Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller


Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

After-sale Serive


- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)


Product Tags:

racking roll forming machine

      

steel roll forming machine

      
China Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller wholesale

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Sussman Machinery(Wuxi) Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)