Sign In | Join Free | My ccnmag.com |
|
Brand Name : Sussman
Model Number : SS-RP
Certification : CE, SGS, ISO
Place of Origin : Wuxi Jiangsu China
MOQ : 1 set
Price : negotiable
Payment Terms : T/T L/C
Supply Ability : 12 sets per month
Delivery Time : 60 working days after deposit
Packaging Details : Standard package with film, plastic and steel wire.
Material Thickness : 0.25mm--3mm
Forming Speed : up to 12m/min
Power Supply : 380V 50HZ 3phase
Dirve System : single chain
Material : galvanized steel sheet
Forming Stations : about 18 stations
Metal roof panel roll forming machine
Technical Parameter
Item NO. |
Description |
Offered specification |
1.1 | Rolling speed | UP to 12 m per min |
1.2 | Rolling thickness | 0.25--3.0mm |
1.3 | Raw material | Quench HRC Plated Chrome |
1.4 | Dimension | 8000mm×1600mm×1200mm |
1.5 | Effective width | 836mm |
1.6 | Feeding Coil width | 1000mm |
1.7 | Roller stations | About 18 stations |
1.8 | Roller material | 45#forge steel, coated with chrome |
1.9 | Shaft diameter | Φ76mm |
1.10 | Transmission | By chain 1.2 inch |
1.11 | Material of chain | 45# forged steel with frequency quenching, 12A |
1.12 | Material of cutting | Cr12Mov with quench HRC58-62° |
1.13 | Tolerance | 10m+-1.5mm |
1.14 | Hydraulic station | 4kw |
Main Components
No. | Name | Quantity |
1 | 3 T manual de-coiler | 1 unit |
2 | Main forming machine | 1 unit |
3 | Control box | 1 unit |
4 | Hydraulic station | 1 unit |
5 | Out tables | 2 units |
Roll Forming Machine Working Flow
De-coiler—Level device —Main roll forming machine—Hydraulic cutting— Run out table
Standard Drawing of Product
Sample U Type Pannel
Customer Visiting
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
![]() |
PLC Control Corrugated Roof Panel Roll Forming Machine For Thick 0.25 - 3mm Material Images |